欢迎来到山东铭德昊智能科技有限公司网站为您提供:干湿分离蹲便器

  • 干湿分离蹲便器厂家
  • 坐便器干湿分离技术
  • 农村改厕干湿分离蹲便器
您现在所在的位置 :首页 - 新闻资讯 > 行业新闻 >

行业新闻

hangye

全国统一咨询热线

0531-88259217

山东铭德昊智能科技有限公司

联系人:吕经理

联系电话:18660797818

公司地址:济南市高新区开拓路2350号

行业新闻

农村改厕专用蹲便器的简易安装方法

来源:http://www.mingdehao.com 日期:2020-06-28 发布人:mingdehao
以前农村都是非常简陋的厕所,这样的厕所非常不卫生,尤其是在夏天。现在农村的生活条件在逐渐改善,农村很多农村家庭都想把土厕所改成侧蹲便器,侧蹲便器不仅卫生而且更方便使用。但是很多农民都不知道如何改侧蹲便器,下面小编就为大家介绍一下简易方法。
In the past, rural areas were very simple toilets, which were very unsanitary, especially in summer. Now the living conditions in rural areas are gradually improving. Many rural families want to change the earth toilet into a side squatting toilet. The side squatting toilet is not only hygienic but also more convenient to use. But many farmers don't know how to change the side squatting pan. Here's a simple method for you.
一、农村改厕蹲便器简易方法
1、 Simple method of changing the toilet and squatting pan in rural areas
1、首先将原本连接蹲厕的水阀关闭,并准备与蹲厕相匹配的马桶以及需要使用到的操作工具。
1. First, close the water valve originally connected to the squatting toilet, and prepare the toilet matching the squatting toilet and the operation tools to be used.
2、将原本的蹲便器拆卸下来,同时注意检查下水管的排水是否通畅,保险起见,还是简单的检验一下比较放心,准备一桶满满的水倒入下水道,观察水流是否顺畅,有没有堵塞的现象发生,若存在堵塞情况,应进行下水道疏通。接下来将下水管接长,直到地面能够足以安装马桶的位置。
2. Dismantle the original squatting pan, at the same time, pay attention to check whether the drainage of the lower water pipe is smooth. For the sake of safety, it is safer to simply check. Prepare a bucket of full water to pour into the sewer, and observe whether the water flow is smooth and whether there is blockage. If there is blockage, the sewer should be dredged. Next, lengthen the downpipe until the ground is enough to install the toilet.
3、接下来测量一下水口圆心至墙的距离,根据测量的距离购买马桶,更好是选择与孔的具体合适的虹吸马桶。
3. Next, measure the distance from the center of the nozzle to the wall, and purchase the toilet according to the measured distance. It is better to choose a specific and appropriate siphon toilet with the hole.
4、接下来进行水泥浆防水工序,卫生间的防水工作是非常重要的,因为在拆卸蹲厕时可能会破坏到原先的防水层,因此需要重新做防水工作。
4. Next, carry out the cement slurry waterproof process. The waterproof work of the toilet is very important, because the original waterproof layer may be damaged when disassembling the squatting toilet, so the waterproof work needs to be done again.
5、将拆卸蹲厕的地面填平,并确定好重新安装坐厕的位置,坐厕的位置一定要精准,因为坐便器一旦安装之后就无法进行更改。
5. Fill the floor of the dismounted squatting toilet, and determine the location of the re installation of the toilet. The location of the toilet must be accurate, because once the toilet is installed, it cannot be changed.
6、在安装马桶之前,一定要对下水管道进行测试,方法就像以上说的一样,以免日后造成不必要的麻烦。
6. Before installing the toilet, it is necessary to test the sewer pipe in the same way as above to avoid unnecessary trouble in the future.
7、好之后,需要将下水管与马桶周围铺上瓷砖,等到地面干透之后就可以使用了。
7. After that, we need to lay tile around the water pipe and toilet, and then we can use it after the ground is dry.
二、蹲便器改坐便器注意事项
2、 Notes on changing squatting pan to sitting pan
1、蹲便器是安装在卫生间地面以下的位置,因为处于凹坑中,所以下水管比较短。而改成坐便器之后,坐便器高度比地面高得多,蹲便器的下水管道长度就不够用了。在蹲便改坐便的施工中,一定要将下水管道的长度测量好,增加多少,加长部分是否紧密牢固都要注意,否则使用起来后患无穷。
1. Squatting pan is installed below the toilet floor, because it is in a pit, so the water pipe is relatively short. After changing to a toilet, the height of the toilet is much higher than the ground, and the length of the sewer pipe of the squatting toilet is not enough. In the construction of changing squatting to sitting, it is necessary to measure the length of the sewer pipe, increase the number, and pay attention to whether the lengthening part is tight and firm, otherwise, it will cause endless troubles.
2、孔距是蹲便改坐便的难题之一,蹲便器的孔距和坐便器的孔距完全不一样,而在将蹲便器取出来之前,很难估计到实际孔距。很多人在买了坐便器回家后,发现没办法安装上。在蹲便改坐便施工之前,一定要请人士帮忙预估测量一下,然后再去买坐便器,这样误差会比较小。
2. The hole distance is one of the most difficult problems in changing squatting toilet to sitting toilet. The hole distance of squatting toilet is totally different from that of sitting toilet. Before taking out squatting toilet, it is difficult to estimate the actual hole distance. Many people found it impossible to install the toilet when they bought it and went home. Before the construction of squatting toilet to sitting toilet, we must ask professionals to estimate and measure it, and then buy the toilet, so the error will be relatively small.
3、在蹲便器改坐便器的过程中,一定要注意避免破坏卫生间的下水管道,防水工程也不能忽视,一旦这些工作没做好会直接影响到后期的使用效果,若是再重新进行修补会消耗更多的人力和物力资源。
3. In the process of changing squatting pan to sitting pan, we must pay attention to avoid damaging the sewer pipe of the toilet, and the waterproof project can not be ignored. Once these works are not done well, it will directly affect the later use effect. If the repair is carried out again, it will consume more human and material resources.
看了今天的文章,我们了解到了农村改厕蹲便器的简便方法。另外对于蹲便器改坐便器的注意事项我们也要多了解一下。虽然说改侧蹲便器不是那么难,但是我们也要仔细的安装好。
Read today's article, we learned the simple method of changing the toilet squatting pan in rural areas. In addition, we also need to know more about squatting toilet to sit toilet. Although it's not so difficult to change the side squatting toilet, we should also carefully install it.
  • 上一条:在选购蹲便器的时候应该注意哪些问题?
  • 下一条:干湿分离粪尿分集式厕所好用吗?